KC APARTMENT WASHING | COMPLETION WALKTHROUGH Editable planning aid; not a contract, acceptance certificate or safety certification. Updated October 1, 2026 Property: ___________________ Scope revision: ___________________ Date: _______________________ Participants: ______________________ [ ] Compare the actual work to building IDs and included surfaces. [ ] Bring accepted test-area records and starting-condition photos. [ ] Review dried result where applicable; note agreed stain limitations. [ ] Record missed, inaccessible, excluded and deferred areas separately. [ ] Record unexpected coating damage or water-entry concerns for assessment. [ ] Confirm agreed photos and water/disposal documentation were supplied. [ ] Confirm equipment, work boundaries and preparation items are restored as agreed. [ ] Confirm access/reopening through the responsible site contacts. [ ] Assign exceptions an owner, next action and review date. [ ] Retain the final scope, photos, exceptions and next inspection date together. EXCEPTION REGISTER (repeat as needed) Building / surface: Observation / photo reference: Status: accepted / contractor review / deferred / excluded / repair assessment Responsible person: Next action: Review date: Notes: Source: https://kcapartmentwashing.com/resources/completion-checklist/